EXPORT · STEP 08 · JETTY LOADING
08EXPORT ROUTE · Jetty Loading
CPO vessel loading.
Tank farm to ship.
After storage and transfer planning are aligned, CPO can be pumped into the nominated liquid-cargo vessel through the selected jetty or loading berth under terminal operating procedures.
For investor presentation purposes, this page shows the commercial logic clearly: RSEC can reserve or contract the storage and terminal interface, then coordinate vessel-side loading through third-party liquid-bulk infrastructure. It does not claim ownership of the berth, tank farm or export terminal.
VESSELTanker / tank barge interfaceReceiving vessel suitability must match edible-oil cargo handling requirements.
TRANSFERJetty manifold and hose systemTerminal-to-vessel loading follows agreed operating procedure.
QUANTITYMeasured dispatchLoading records, tank data and survey basis support settlement.
MODELContracted export executionRSEC coordinates the loading chain using contracted third-party logistics assets.

STEP 3 — Vessel-side loading at the jetty, showing the nominated liquid-cargo vessel receiving CPO under berth loading procedures.
